Is the plot suitable?
We check land classification, slope, access, shading and — most importantly — the distance and capacity of the nearest grid connection point.
Guide
A ground-mount plant turns unused or low-yield land into a long-term producing asset — for self-consumption, for a company site or as a standalone plant.
Request a project assessmentWe check land classification, slope, access, shading and — most importantly — the distance and capacity of the nearest grid connection point.
Available capacity at the substation decides what can be built. This check comes before any layout or financial model.
Ground-mount plants need municipal and regional approvals plus an environmental assessment above certain sizes. We prepare and follow the file.
Mounting structures, MV station, fencing and monitoring, followed by maintenance and performance reporting over the plant's lifetime.