Ground-Mount Solar Parks
Open-field plants from 1 MWp to 50 MWp: land screening, yield modelling, tracker or fixed-tilt design, and full grid-connection management.

01 / Intro
Helping industry, agriculture and landowners across Costa Blanca cut energy costs
Large-scale photovoltaics engineered, permitted and built by a local EPC team. Cut energy costs by up to 70%, secure your grid connection, and put idle land to work.
Residential solar logic does not scale. We design plants around load profiles, grid capacity, structural limits and 25-year yield — not around a roof full of panels.
Open-field plants from 1 MWp to 50 MWp: land screening, yield modelling, tracker or fixed-tilt design, and full grid-connection management.
Logistics halls, factories and cold stores. Structural survey, ballasted or fixed mounting, and production matched to your load profile.
Direct self-consumption, collective self-consumption or a long-term PPA — we model each scenario against your real tariff and consumption.
Utility-scale battery systems for peak shaving, backup and arbitrage, integrated with your plant's SCADA from day one.
Industrial consumers in the Valencian Community face some of the highest energy costs in Spain. Here is why — and the fix.
01 / Issue
Energy is now one of the largest lines in your P&L. On-site generation removes the volatile part of it.
02 / Issue
Connection points are scarce. We secure capacity, run the permitting and handle the utility dialogue for you.
03 / Issue
Unused hectares can carry a solar park with a predictable 25-year revenue stream instead of nothing.
The solution? Solar designed around your plant, not your roof.

Before anything is ordered, we model your roof or land in 3D. Every proposal includes a panel layout plan, so you can see exactly how many modules fit, where they sit and what they will produce.




Ausgeführte Anlagen: Dachbelegung, Montage und Verteilertechnik aus eigener Ausführung.












We handle everything. You get the energy.
Send us your consumption data or land details. We respond within 48 hours.
Site visit, structural or land survey, grid capacity check and yield simulation.
Layout, single-line diagram, CAPEX, subsidies, payback and IRR — all in one proposal.
We handle licences, utility filings and build with our own project team.
Grid connection, monitoring handover, and a maintenance plan that protects your yield.
We develop and build solar from Alicante up the Costa Blanca to the Valencia area — industrial estates, farmland and open sites, plus villas and homes.

Public support programmes for solar exist. We check what applies to your project and always pass on the current programmes to our clients.
Advice
We review individually which programmes fit your project.
Current programmes
Regional and national schemes change constantly — we keep you up to date.
Application support
We help with documents and filing.
A rooftop plant of 500 kWp typically takes 3–5 months from contract to grid connection. Ground-mount parks depend on permitting and grid access, usually 9–18 months.
Not always. If your load profile matches daytime production, batteries are optional. For peak shaving, backup or arbitrage they often pay for themselves.
With a storage system and an island-capable inverter, critical loads keep running when the grid goes down.
Yes. We can develop the project and lease the land, or build it for you as an EPC contractor — both models are on the table.
Most industrial clients cut their electricity cost by 40–70%. The exact figure depends on tariff, consumption curve and system size.
There are regional and national support programmes as well as tax advantages. We advise you, check the requirements and always pass on the current programmes.
Free project check
Send us your consumption data or land details. No obligation. No hidden costs.